- Home
- Our references
- Orange chooses APL to design and build a 5000 m², Tier-IV data center with a direct-air free-cooling system
Orange chooses APL to design and build a 5000 m², Tier-IV data center with a direct-air free-cooling system
Customer name : | Orange |
Area of business : | Telecom |
Accompanying mode : | Auditing & Consulting - Project management assistance - Project Management |
Type of service : | Design and construction of a Tier-IV data center, with a direct-air free-cooling system - Data center management assistance |
In 2009, Orange initiated a project to build an entirely new data center, in order to meet its customer's data storage needs as they evolved over the coming 10–20 years. The telecom operator commissioned APL to design and build this IT center, which would cover 5000 m² and reach very high levels of service continuity and energy efficiency.
Dubbed "Normandy" and located in the town of Val-de-Reuil, in the Eure (France), the data center houses 4 computer rooms, as well as their associated equipment rooms. It was the first site in France to be equipped with a direct-air free-cooling system.
Project objective
- Design a new, 5000-m² modular data center housing four 1200-m² computer rooms
- Ensure the site provides very high levels of availability (Tier IV): 24/7 operation without any service interruption
- Ensure a low environmental impact and rein in energy consumption
- Provide contracting authority support for the construction of rooms 1 and 2
- Manage the construction of rooms 3 and 4
Services provided
Rooms 1 and 2 (2009–2012)
- Assistance with the design of a dual-building site housing 4 computer rooms, organized into two groups of two operating independently
- Scheduling, assistance with soliciting and selecting project managers, supervision of construction
Rooms 3 and 4 (2013–2015)
- Project management, worksite monitoring and management for all work packages
Operational assistance
- In order to ensure continuity of service and energy efficiency: drafting of an operating guide to help technical personnel get familiarized with the new data center and handle its operation in accordance with best practices.
Client benefits
- Comprehensive assistance provided by APL, from the feasibility study up to the acceptance phase
- A site with excellent continuity of service: 3-day operational independence in the event that redundant power feeds are interrupted
- An HPE (High Energy Performance) site: free cooling of equipment (using external cold air) supported by cold production solutions should the site exceed 21°C (70°F)
- Scalability equipment, in order to absorb load spikes: 2 MW of power for the computer rooms, upgradeable to 2.5 MW
Last News
Digital twins: what benefits for data centers?
Digital twins can provide answers to the questions that data center builders and hosts ask themselves, such as: how can ...
En savoir plus
APL Data Center continues its European expansion with a new branch in Italy
APL Data Center, the leading French consultancy and engineering firm specializing in the design and construction of data centers, announces ...
En savoir plus
White Paper: Fire risk management for lithium-ion batteries in data centers
Lithium-ion batteries, with their high energy density and longevity, are gradually replacing lead-acid batteries to secure the power supply of ...
En savoir plus