- Home
- Our references
- Orange chooses APL to design and build a 5000 m², Tier-IV data center with a direct-air free-cooling system
Orange chooses APL to design and build a 5000 m², Tier-IV data center with a direct-air free-cooling system
| Customer name : | Orange |
| Area of business : | Telecom |
| Accompanying mode : | Auditing & Consulting - Project management assistance - Project Management |
| Type of service : | Design and construction of a Tier-IV data center, with a direct-air free-cooling system - Data center management assistance |
In 2009, Orange initiated a project to build an entirely new data center, in order to meet its customer's data storage needs as they evolved over the coming 10–20 years. The telecom operator commissioned APL to design and build this IT center, which would cover 5000 m² and reach very high levels of service continuity and energy efficiency.
Dubbed "Normandy" and located in the town of Val-de-Reuil, in the Eure (France), the data center houses 4 computer rooms, as well as their associated equipment rooms. It was the first site in France to be equipped with a direct-air free-cooling system.
Project objective
- Design a new, 5000-m² modular data center housing four 1200-m² computer rooms
- Ensure the site provides very high levels of availability (Tier IV): 24/7 operation without any service interruption
- Ensure a low environmental impact and rein in energy consumption
- Provide contracting authority support for the construction of rooms 1 and 2
- Manage the construction of rooms 3 and 4
Services provided
Rooms 1 and 2 (2009–2012)
- Assistance with the design of a dual-building site housing 4 computer rooms, organized into two groups of two operating independently
- Scheduling, assistance with soliciting and selecting project managers, supervision of construction
Rooms 3 and 4 (2013–2015)
- Project management, worksite monitoring and management for all work packages
Operational assistance
- In order to ensure continuity of service and energy efficiency: drafting of an operating guide to help technical personnel get familiarized with the new data center and handle its operation in accordance with best practices.
Client benefits
- Comprehensive assistance provided by APL, from the feasibility study up to the acceptance phase
- A site with excellent continuity of service: 3-day operational independence in the event that redundant power feeds are interrupted
- An HPE (High Energy Performance) site: free cooling of equipment (using external cold air) supported by cold production solutions should the site exceed 21°C (70°F)
- Scalability equipment, in order to absorb load spikes: 2 MW of power for the computer rooms, upgradeable to 2.5 MW
Last News
APL Data Center has obtained ISO 45001 certification and renewed its ISO 9001 and ISO 14001 certifications
The attainment of ISO 45001 certification, along with the renewal of ISO 9001 and ISO 14001 certifications, recognizes APL Data ...
En savoir plus
APL Data Center Accelerates Its Growth in Europe and Reports Revenue of €114.9 Million in 2025, Up 84%
APL Data Center, a group specializing in consulting, engineering, and the design and construction of data centers, announces strong growth ...
En savoir plus
APL Data Center announces the entry of CAPZA and ISAI funds into its capital to accelerate its development in Europe and internationally
Paris, April 16, 2026 — APL Data Center, a leading French consulting and engineering firm specializing in the design and ...